Stringing of Powerline

by | Jun 24, 2021

Powerlink, the Transmission Network Service Provider, has completed the stringing of the high voltage transmission line which will connect Western Downs to the electricity grid.

A helicopter was used to string the line to newly-built transmission towers and our videographer captured some fascinating footage. Check it out below: